PN-6 and BD-8
Enclosure Installation Manual
Effective: June, 2003
®
®
®
Powernode
Series
Enclosures
Zobrazit stránku 0
1 2 3 4 5 6 ... 33 34

Shrnutí obsahu

Strany 1 - Powernode

PN-6 and BD-8Enclosure Installation ManualEffective: June, 2003®®®PowernodeSeriesEnclosures

Strany 2 - Alpha PN-6 / BD-8

1. Overview10031-032-C2-002 Rev. BFig. 1-1 PN-6 with BD-8 battery enclosure1.1 Introduction Alpha's PN Series Powernode enclosures offer compl

Strany 3 - PN-6/BD-8

2. Pre-Installation11031-032-C2-002 Rev. BThe site must be planned so that the enclosure will receive good air flow. Ifpossible, in areas of extreme h

Strany 4

2. Pre-Installation12031-032-C2-002 Rev. BFig. 2-1 PN-6, Single-wide Cabinet Pad dimensions(Polymer Concrete Precast Pad P/N 641-089-10)2.2 Concrete P

Strany 5

2. Pre-Installation13031-032-C2-002 Rev. BFig. 2-2 Site Cross Section2.3 Concrete Pad Installation1Undisturbed Ground2Compacted Gravel (approx. 12&qu

Strany 6 - Product Safety

2. Pre-Installation14031-032-C2-002 Rev. BFig. 2-3 Enclosure Grounding(The above drawing is for reference only, is not to scale, and may lack some det

Strany 7 - General Safety Precautions

3. Installation15031-032-C2-002 Rev. BFig. 3-1 Enclosure protection3.1 Enclosure ProtectionAlpha Technologies, Inc. cannot anticipate all of the ways

Strany 8 - To avoid damage

3. Installation16031-032-C2-002 Rev. BFig. 3-2 Enclosure Lifting MethodsThe PN-6 cabinet as shipped, is extremely heavy. A safe means oftransportatio

Strany 9 - To avoid injury:

3. Installation17031-032-C2-002 Rev. B3.3 Enclosure InstallationProcedure:NOTE: A 25+ year continuous vapor barrier must be used between theenclosure

Strany 10 - 1. Overview

3. Installation18031-032-C2-002 Rev. B3.4 Utility PoweringThe XM2 Power Supplies are powered by either 120Vac or 240Vac (120/120grounded neutral), att

Strany 11 - 2. Pre-Installation

3. Installation19031-032-C2-002 Rev. BFig. 3-3 Service Entrance WiringTools Needed:No. 1 Flat Head ScrewdriverAdjustable Pliers (Channel-Lock)Procedur

Strany 12

PowerAlpha Technologies®Alpha PN-6 / BD-8Powernode Enclosure Installation ManualEffective: June, 2003031-032-C2-002, Rev. B — © 2003 Alpha Technologie

Strany 13

3. Installation20031-032-C2-002 Rev. BFig. 3-4 System Grounding3.4.1 Electrical Service Connection, continued3.4 Utility Powering, continued3. Connec

Strany 14

3. Installation21031-032-C2-002 Rev. BFig. 3-6 Connecting COAX to SPI Output PortFig. 3-5 Removing SPI Cover3.5 Service Power Inserter1. The SPI box(e

Strany 15 - 3. Installation

3. Installation22031-032-C2-002 Rev. BFig. 3-7 Battery Hazards, Date Code Label3.6 Battery Installation3.6.1 Battery SafetyBattery systems represent a

Strany 16

3. Installation23031-032-C2-002 Rev. BFig. 3-8 Battery Terminal Connections3.6.3 Battery Terminal ConnectionsThe accompanying drawings are for illust

Strany 17

3. Installation24031-032-C2-002 Rev. BFig 3-9 BD-8 Battery Drawer3.6.4 Battery ConnectionTools Needed:Two 7/16” open end wrenchesProcedure:Note: Th

Strany 18

3. Installation25031-032-C2-002 Rev. BFig 3-10 Battery Power Distribution, 36 VDC3.6 Battery Installation, continued3.6.5 Battery Connection, Numb

Strany 19

3. Installation26031-032-C2-002 Rev. BFig 3-11 Battery Power Distribution, 48 VDC3.6.6 Battery Connection, Numbering for 48 Volt Battery Pack3.6 B

Strany 20

3. Installation27031-032-C2-002 Rev. B3.6 Battery Installation, continued3.6.7 Battery Monitor Connection with optional Status Monitoring ModuleThe B

Strany 21

3. Installation28031-032-C2-002 Rev. B3.7 Power Supply InstallationTools Needed:NoneProcedure:1. Place an XMS2 power supply on one of the trays inside

Strany 22 - DANGER/POISON

3. Installation29031-032-C2-002 Rev. B3.7 Power Supply Installation, continued3.7.1 Power Supply Installation, continued3. Verify that the Battery Cir

Strany 23

PN-6/BD-8Enclosure Installation Manual031-032-C2-002, Rev. BEffective Date: June, 2003Copyright© 2003Alpha Technologies, Inc.NOTE: Photographs contain

Strany 24

3. Installation30031-032-C2-002 Rev. BFig 3-13 Battery Remote Temp Sensor (RTS) Placement3.8 Battery Remote Temperature Sensor (RTS)Tools Needed:Ad

Strany 25

3. Installation31031-032-C2-002 Rev. B Fig. 3-14 LAP Plus Fig. 3-15 Line Surge Arrester3.9 Lightning Arrester OptionAlpha’s LA Serie

Strany 26

3. Installation32031-032-C2-002 Rev. B3.10 Part Numbers for Optional EquipmentItem: Part Number:Star Lock Security Bolt (X4) 744-897-20Security Key 64

Strany 28

Due to continuing product improvements, Alpha reserves the right to change specifications without notice.Copyright © 2003 by Alpha Technologies, Inc.

Strany 29

Preface4031-032-C2-002 Rev. BPowernodeSeriesEnclosuresTable of ContentsOVERVIEW1.1 Introduction ...

Strany 30

Preface5031-032-C2-002 Rev. BList of FiguresOVERVIEWFig. 1-1 PN-6 with BD-8 battery enclosure ...

Strany 31

Product Safety6031-032-C2-002 Rev. BNOTE: Alpha Technologies’ products are subject to change through continualimprovement processes. Therefore, specif

Strany 32

Product Safety7031-032-C2-002 Rev. BA “Warning” identifies conditions and actions that pose a hazard to the user.A “Caution” identifies conditions and

Strany 33

Product Safety8031-032-C2-002 Rev. BCautionsNOTE: Enclosure, equipment or parts may be damaged or cause damage if used orinstalled improperly.To avoid

Strany 34 - Alpha Technologies

Product Safety9031-032-C2-002 Rev. BBattery Safety NotesLead-acid batteries contain dangerous voltages, currents and corrosive material. Battery insta